Rebar sizes: diameter and weight chart
US rebar sizes #3 through #8 have nominal diameters equal to the bar number divided by eight inches: #4 is ½ inch and #5 is ⅝ inch. Use the published chart for larger sizes: #9, #10 and #11 are 1.128, 1.270 and 1.410 inches, respectively.
US rebar size chart
These nominal diameters and weights per foot are listed in the Concrete Reinforcing Steel Institute’s Specialty & Corrosion-Resistant Steel Reinforcement: Product Guide, in its inch-pound bar table. The millimetre column below is a conversion of the displayed inch diameter, rounded to three decimal places; it is not a separate metric bar designation. Keep the original size label when specifying US reinforcing bars.
| US size | Nominal diameter (in) | Converted diameter (mm) | Nominal weight (lb/ft) |
|---|---|---|---|
| #3 | 0.375 | 9.525 | 0.376 |
| #4 | 0.500 | 12.700 | 0.668 |
| #5 | 0.625 | 15.875 | 1.043 |
| #6 | 0.750 | 19.050 | 1.502 |
| #7 | 0.875 | 22.225 | 2.044 |
| #8 | 1.000 | 25.400 | 2.670 |
| #9 | 1.128 | 28.651 | 3.400 |
| #10 | 1.270 | 32.258 | 4.303 |
| #11 | 1.410 | 35.814 | 5.313 |
Read across a row to identify one product size. Read down the table to compare dimensions or estimate how the mass changes for the same total length. The table does not select the reinforcement for a slab, beam or footing. A project requires the specified bar size together with the grade, arrangement, cover and other details on its drawings.
How to use the bar-number shortcut
For the smaller sizes covered by the shortcut, the number is a convenient way to remember the diameter. It does not tell you the number of bars in a bundle, the spacing between bars or the length of a stock piece. When a supplier asks which size you need, give the size designation rather than a loose description such as “medium reinforcing rod.”
Stop using the eighth-inch shortcut above #8 and read the chart instead. A quantity sheet can look internally consistent while using the wrong diameter for a larger bar. If the source drawing specifies a size outside this table, obtain the matching published properties rather than extending the pattern. Also confirm the designation system when a drawing or delivery comes from a different market.
Bar size and steel grade describe different things
The size identifies the nominal bar geometry. The grade identifies a strength classification, and the material specification identifies the steel product being supplied. Record those as separate fields in an order. A larger diameter does not, by itself, prove that a bar meets a requested grade or material specification. Equally, matching a grade does not make different diameters interchangeable.
CRSI’s Bar Identification guide describes rolled markings for the producing mill, bar size, steel type and grade. It identifies S with carbon-steel reinforcing bars under ASTM A615 and W with low-alloy bars under ASTM A706. Use the guide with the delivery documentation to identify the product; the markings alone are not a complete set of project installation instructions.
When checking a delivery, match the size and other identification to the order before separating the bundle. Keep the tags with the relevant material, especially if several sizes arrive together. If the marking is unclear, photograph it and ask the supplier for the matching documentation. Guessing from the apparent thickness is a poor way to resolve an ambiguous or damaged label.
From a bar size to a weight estimate
The weight calculation is total length in feet × nominal pounds per foot. First establish the required lengths from the actual layout, then apply the row for the specified size. The rebar calculator handles a rectangular slab grid with selectable #3, #4, #5 and #6 bars in imperial mode. The larger sizes in the chart are reference information, not additional options in that calculator.
For an arithmetic example, enter a 20 × 20 foot slab, 12-inch spacing, 3-inch edge cover, 20-foot stock and a 5% purchasing allowance. Those are example inputs, not a reinforcement recommendation. The calculator gives 40 grid bars and 780 ft of cut grid length. Keeping that layout unchanged gives the following weight comparison.
| Selected size | Cut grid length | Calculated grid weight |
|---|---|---|
| #3 | 780 ft | 293.28 lb |
| #4 | 780 ft | 521.04 lb |
| #5 | 780 ft | 813.54 lb |
| #6 | 780 ft | 1,171.56 lb |
The comparison isolates the effect of bar size on estimated weight. It does not show equivalent designs. The spacing and bar count remain fixed only to make the arithmetic easy to compare. Do not use a similar total weight as the basis for replacing the specified reinforcement with a different size or arrangement; obtain a revised detail when a substitution is needed.
Cut length is different from purchased stock
In the #4 example, the calculator estimates 42 pieces of 20-foot stock after its allowance. At the published nominal weight, those purchased pieces total 561.12 lb. That is different from the 521.04 lb in the cut grid because the purchase includes material beyond the finished grid lengths. Label the two weights so that an installed-material estimate is not mistaken for the delivery weight.
An actual cutting schedule may include reusable offcuts, bends, hooks, laps or pieces supplied already fabricated. Group pieces by size and required shape before summing the order. A single total length is useful for an initial mass estimate, but it cannot tell a fabricator where to cut or bend. Keep the piece schedule attached to the drawing revision that produced it.
Spacing, cover and splices belong to the design
A size chart does not supply the required spacing. It also does not establish edge cover, embedment, hook dimensions or splice lengths for a project. Copy those details from the approved design and resolve missing information before treating a calculator result as a purchase list. In particular, do not assume that a calculator’s default inputs are a code-approved detail for every slab.
This site’s quantity model uses a simplified lap allowance when a required straight run exceeds the selected stock length. Treat that as an estimating assumption and check the actual splice schedule before ordering. The worked grid above uses pieces shorter than the selected stock, so its weight comparison does not depend on a splice calculation. That keeps the example focused on the relationship between size and weight.
Coordinate the steel list with the concrete quantities
Use the concrete slab calculator for the slab volume and the concrete footing calculator for footing shapes after their dimensions are established. Keep these estimates beside the steel schedule. A change to an edge, a thickened section or an opening may affect several material quantities, even if the outside length and width remain the same.
For other shapes, the concrete calculator provides a volume estimate. Give each takeoff a short description and the drawing revision used. This makes it possible to check whether the concrete order and reinforcing order refer to the same design. It also helps separate a real design change from a simple correction to a quantity or unit conversion.
A practical rebar order checklist
- Copy the bar size, grade, material specification and any coating from the project documents.
- List the required straight or fabricated pieces by size, length, shape and quantity.
- Separate installed cut length from purchased stock and record how offcuts and allowances are treated.
- Check that the supplier’s designation system matches the one on the drawings.
- Retain bundle tags and delivery documentation so that the supplied material can be checked against the order.
If a supplier proposes a replacement because a size or stock length is unavailable, describe the proposed change precisely. A different stock length may alter the cutting plan, while a different bar size changes the specified reinforcement. Record the agreed revision before updating quantities. This prevents a purchasing conversation from quietly changing a detail that another person still expects to be built as drawn.
Sources: Concrete Reinforcing Steel Institute, Specialty & Corrosion-Resistant Steel Reinforcement: Product Guide, inch-pound bar table (PDF page 27; public copy hosted by Alaska DOT); and CRSI, Bar Identification: crsi.org/reinforcing-basics/reinforcing-steel/bar-identification/. The chart reports published nominal properties, not project-specific design requirements.
Frequently asked questions
What diameter is #4 rebar?
#4 has a nominal diameter of 0.500 inch, equivalent to 12.700 mm, and a nominal weight of 0.668 lb per foot.
Is #9 rebar exactly nine-eighths of an inch?
No. Its published nominal diameter is 1.128 inches. Use the table for #9 and larger sizes rather than extending the smaller-bar shortcut.
Can I replace #4 rebar with fewer #5 bars?
A size or weight comparison does not establish an equivalent design. Have the revised size and arrangement approved in the project details before changing the order.
Why is the stock weight higher than the grid weight?
Purchased stock can include cutting leftovers and an allowance beyond the finished grid. Keep purchased length and installed cut length as separate quantities.