How to use the Concrete Footing Calculator

  1. Pick strip, pad or round pier.
  2. Enter the length, width and depth of one footing (or diameter and depth for a pier) and how many there are.
  3. Add waste — 10–15 % for footings dug straight into soil.
  4. Read the cubic yards or bags.

Formula

Strip or pad = length × width × depth × count. Pier = π × (diameter ÷ 2)² × depth × count.

A typical strip footing 16 in wide and 8 in deep needs about 0.033 yd³ per foot of wall.

Worked example

With the values preset in the calculator above: (Strip footing)

Length
40 ft
Width
16 in
Thickness
8 in
Quantity
1
Extra for waste
10 %
Bag size
80 lb bags
Concrete needed (with waste)
1.45 yd³ (39.1 ft³)
Without waste
1.32 yd³ (35.6 ft³)
Bags
66
Weight
5,202 lb (2.6 tons)
Estimated cost
$239

Footing size rules of thumb

  • Width: about twice the wall thickness (16 in for an 8 in wall).
  • Depth: at least 6–8 in thick and below the frost line.
  • Piers for decks: often 10–12 in diameter, 4 ft deep in cold climates.
  • Always follow your local building code and soil conditions.

Frequently asked questions

How much concrete for a 40 ft footing?

A 40 ft strip footing 16 in wide and 8 in deep needs 1.32 yd³ (35.6 ft³) before waste.

How many bags for a deck footing?

A 12 in round pier 4 ft deep takes about 6 bags of 80 lb concrete with 10 % extra.

Do footings need rebar?

Most codes require two #4 bars in continuous footings. Pad and pier footings usually get rebar too — check your plans.